Pas napędowy wariatora wirnika 51529626

3 000,00  z VAT

Oryginał CNH

Dane techniczne:
Szerokość: 57,20 mm
Długość: 2802,57 mm
Waga: 2,38 kg
51529626
 

Opis

Pasuje do:

7140 – KOMBAJN – POZIOM 4B (NA) – 2014 (03.14 – 15.10.)

5130 — POŁĄCZENIE POZIOMU ​​4 (01.12.-12.12.)

5140 – KOMBAJN – POZIOM 4 (NA) (11.16 – 09.17)

7130 – KOMBAJN – WSPÓLNA KABINA TIER 4 (01/13 – 12/13)

6088 – KOMBAJN Z PRZEPŁYWEM OSIOWYM (NA) (04/07 – 01/12)

5130 – KOMBAJN – WSPÓLNA KABINA TIER 4 (01/13 – 03/14)

9230 – KOMBAJN – WSPÓLNA KABINA TIER 4 (01/13 – 09/14)

6130 — POŁĄCZENIE POZIOMU ​​4 (01.12.-12.12.)

2388 – KOMBAJN CASE IH O PRZEPŁYWIE OSIOWYM (NA) BTW HAJ292001 i HAJ300000 (01/98-12/07)

5140 – KOMBAJN – TIER 4B (NA) ASN – YFG014001 (10/15 – 09/16)

7088 – KOMBAJN Z PRZEPŁYWEM OSIOWYM (NA) (04/07 – 01/12)

6140 – KOMBAJN – POZIOM 4B (NA) (03/14 – 10/15)

7130 — POŁĄCZENIE POZIOMU ​​4 (01.12.-12.12.)

5088 – KOMBAJN Z PRZEPŁYWEM OSIOWYM (NA) (04/07 – 01/12)

5140 — KOMBAJN MY18 TIER 4B (UE) (10.17-18.09.)

5140 – KOMBAJN – TIER 4B (UE) ASN – YFG014001 (10/15 – 09/16)

5130 — POŁĄCZENIE POZIOMU ​​2 (01.12.-12.12.)

7130 – KOMBAJN – WSPÓLNA KABINA TIER 4 (UE) (01/13 – 03/14)

5140 – KOMBAJN – TIER 4B (UE) (10/18 – )

7140 – KOMBAJN – POZIOM 2 (03/14 – 10/15)

5130 – KOMBAJN – WSPÓLNA KABINA TIER 4 (UE) (01/13 – 03/14)

7140 – KOMBAJN – TIER 4B (UE) – 2014 (03.14 – 15.10.)

5140 — KOMBAJN MY18 TIER 2 (APAC/LA) (17.10.-18.09.)

5140 – KOMBAJN – TIER 4B (UE) – 2016 (16.11. – 17.09.)

7130 – KOMBAJN – WSPÓLNA KABINA TIER 2 (01.11 – 06.15)

6140 – KOMBAJN – TIER 4B (UE) – 2014 (03.14 – 15.10.)

5140 – KOMBAJN – TIER 2 ASN – YFG014001 (10/15 – 07/16)

5140 – KOMBAJN – TIER 4B (UE) – 2014 (03.14 – 15.10.)

6088 – KOMBAJN Z PRZEPŁYWEM OSIOWYM (UE) (12.07 – 12.11)

5140 — KOMBAJN — POZIOM 2 (RZĘD) (18.10 — 19.09)

5150 — KOMBAJN MY20 TIER 2 (APAC/LA) (11/19 — )

8230 – KOMBAJN – WSPÓLNA KABINA TIER 4 (UE) (01/13 – 09/14)

5150 — KOMBAJN MY21 POZIOM 2 (RZĘD) (10/20 — )

9230 – KOMBAJN – WSPÓLNA KABINA TIER 4 (UE) (01/13 – 09/14)

5130 – KOMBAJN – WSPÓLNA KABINA TIER 2 (01/12 – 12/13)

5140 – KOMBAJN – POZIOM 2 (03/14 – 10/15)

6130 — POŁĄCZENIE POZIOMU ​​2 (01.12.-12.12.)

5150 – KOMBAJN MY21 ETAP 5 (UE) (10/20 – )

6130 – KOMBAJN – WSPÓLNA KABINA TIER 4 (UE) (01/13 – 03/14)

5150 – KOMBAJN MY20, ETAP 5 (UE) (11/19 – )

6140 – KOMBAJN – POZIOM 2 (03/14 – 10/15)

7088 – KOMBAJN Z PRZEPŁYWEM OSIOWYM (UE) (12.07 – 12.11)

7130 — POŁĄCZENIE POZIOMU ​​2 (01.12.-12.12.)

5140 – KOMBAJN – POZIOM 2 (APAC/LA) (16.11. – 17.09.)

5088 – KOMBAJN Z PRZEPŁYWEM OSIOWYM (UE) (12.07 – 12.11)

6130 – KOMBAJN – WSPÓLNA KABINA TIER 2 (01/13 – 08/15)

5088 – KOMBAJN Z PRZEPŁYWEM OSIOWYM (RU) (12.07 – 12.11)